Material Handling

Ten Principles of Material Handling

PLANNING

All material handling should be the result of a deliberate plan where the needs, performance objectives and functional specification of the proposed methods are completely defined at the outset.

A material handing plan defines the material (what) and the moves (when and where); together they define the method (how and who).

 

KEY POINTS:

The plan should be developed in consultation between the planner(s) and all who will use and benefit from the equipment to be employed. Success in planning material handling projects generally requires a team approach involving suppliers, consultants when appropriate, and end user specialists from management, engineering, computer and information systems, finance and operations.

The material handling plan should reflect the strategic objectives of the organization as well as the more immediate needs. The plan should document existing methods and problems, physical and economic constraints, and future requirements and goals.

The plan should promote concurrent engineering of product, process design, process layout, and material handling methods, as opposed to independent and sequential design practices.

 


STANDARDIZATION

Material handling methods, equipment, controls and software should be standardized within the limits of achieving overall performance objectives and without sacrificing needed flexibility, modularity and throughput, anticipation of changing future requirements.

 

KEY POINTS:

The planner should select methods and equipment that can perform a variety of tasks under a variety of operating conditions and in Standardization applies to sizes of containers and other load forming components as well as operating procedures and equipment. Standardization, flexibility and modularity must not be incompatible.

 


WORK

Material handling work should be minimized without sacrificing productivity or the level of service required of the operation.

 

KEY POINTS:

Simplifying processes by reducing, combining, shortening or eliminating unnecessary moves will reduce work. Consider each pickup and set-down, or placing material in and out of storage, as distinct moves and components of the distance moved. Process methods, operation sequences and process/equipment layouts should be prepared that support the work minimization objective. Where possible, gravity should be used to move materials or to assist in their movement while respecting consideration of safety and the potential for product damage. The shortest distance between two points is a straight line.

 


ERGONOMIC

Human capabilities and limitations must be recognized and respected in the design of material handling tasks and equipment to ensure safe and effective operations.

Definition: Ergonomics is the science that seeks to adapt work or working conditions to suit the abilities of the worker.

 

KEY POINTS:

Equipment should be selected that eliminates repetitive and strenuous manual labor and which effectively interacts with human operators and users. The ergonomic principle embraces both physical and mental tasks. The material handling workplace and the equipment employed to assist in that work must be designed so they are safe for people.

 


UNIT LOAD

Unit loads shall be appropriately sized and configured in a way which achieves the material flow and inventory objectives at each stage in the supply chain.

 

KEY POINTS:

Less effort and work is required to collect and move many individual items as a single load than to move many items one at a time.

Keep in mind that the load size and composition may change as material and product moves through stages of manufacturing and the resulting distribution channels.

 


SPACE UTILIZATION

Effective and efficient use must be made of all available space.

 

KEY POINTS:

In work areas, cluttered and unorganized spaces and blocked aisles should be eliminated.

In storage areas, the objective of maximizing storage density must be balanced against accessibility and selectivity.

 


SYSTEM

Material movement and storage activities should be fully integrated to form a coordinated, operational system which spans receiving, inspection, storage,production, assembly, packaging, unitizing,order selection, shipping, transportation and the handling of returns.

 

KEY POINTS:

Systems integration should encompass the entire supply chain including reverse logistics. It should include suppliers, manufacturers, distributors and customers. Inventory levels should be minimized at all stages of production and distribution while respecting considerations of process variability and customer service.

 


AUTOMATION

Material handling operations should be mechanized and/or automated where feasible to improve operational efficiency, increase responsiveness, improve consistency and predictability,

 

KEY POINTS:

Pre-existing processes and methods should be simplified and/or re-engineered before any efforts at installing mechanized or automated systems. Computerized material handling systems should be considered where appropriate for effective integration of material flow and information management.

Treat all interface issues as critical to successful automation, including equipment to equipment, equipment to load, equipment to operator, and control communications. All items expected to be handled automatically must have features that accommodate mechanized and automated handling.

 


ENVIRONMENTAL

Environmental impact and energy consumption should be considered as criteria when designing or selecting alternative equipment and material handling systems.

 

KEY POINTS:

Containers, pallets and other products used to form and protect unit loads should be designed for reusability when possible and/or biodegradability as appropriate. Systems design should accommodate the handling of spent dunnage, empty containers and other by-products of material handling.

Materials specified as hazardous have special needs with regard to spill protection, combustibility and other risks.

 


LIFE CYCLE COST

A thorough economic analysis should account for the entire life cycle of all material handling equipment and resulting systems.

 

KEY POINTS:

Life cycle costs include capital investment, installation, setup and equipment programming, training, system testing and acceptance, operating (labor, utilities, etc.), maintenance and repair, reuse value, and ultimate disposal. A plan for preventive and predictive maintenance should be prepared for the equipment, and the estimated cost of maintenance and spare parts should be included in the economic analysis. A long-range plan for replacement of the equipment when it becomes obsolete should be prepared. Although measurable cost is a primary factor, it is certainly not the only factor in selecting among alternatives. Other factors of a strategic nature to the organization and which form the basis for competition in the market place should be considered and quantified whenever possible.